Comment: Why off-site is the place to be for construction

01/08/2018 |

DELTA BLOC UK's MD Tony Walker tells Highways about how his leading road barrier company is part of a new era of modular off-site construction and supply chain innovation helping major clients like Highways England meet their objectives.

The introduction of standardised, modularised, and prefabricated components through off-site construction is expected to grow, which has certainly proven to be the case with DELTA BLOC UK a manufacturer, supplier and installer of precast concrete road safety barrier systems.

Following a tough start to UK business in 2010, we have seen a significant increase in both sales and general interest in our precast concrete barrier systems over the last three years as the market has slowly adjusted to new concepts and ideas

Our recent involvement with installations on a number of projects in the Highways England Smart Motorway programme was a key milestone for us because it demonstrates very clearly that the market place now sees precast concrete as a very credible alternative to the more commonly used slipform methods of construction.

DELTA BLOC products are manufactured off-site and the modular lean construction process means a quick and efficient on-site operation, where the quality of the product can be guaranteed first time. These are both key factors, which could help achieve Highways England’s goal of reduced delivery and installation times.

There are no issues to overcome with supply of ready mixed concrete and inclement weather, both of which can be very problematic when carrying out slipform operations and it is for these reasons that many of Highways England’s delivery partners are now looking more favourably at precast barrier solutions for the central reserve.

For many contractors, to meet their construction programme, certainty of delivery all year round is a key driver. The modular, off-site construction approach also means less waste is generated in production providing a more sustainable, environmentally friendly product.

Delivery truck movements are also halved when installing the DELTA BLOC systems compared to the number of concrete truck mixers attending site for the same length of slipform barrier. This reduces traffic entering and exiting the works zone, improving safety, reducing CO² emissions, and keeps the network flowing, further demonstrating the positive benefits of the precast installation process.

The use of DELTA BLOC products on Highways England Smart Motorway projects shows that clients now have the confidence not only in the product, but also in the company to deliver schemes of this magnitude. CE marked products produced in a factory environment are delivered and installed on-site by competent and trained installers, providing maximum protection for road users, while minimising disruption.

Additionally, it also shows that DELTA BLOC UK can provide the full range of services from technical assistance up-front through to completion.

Increased productivity of precast concrete barrier systems over slipform barrier solutions;

  • Up to five times faster installation than in-situ barrier systems = reduced programme
  • Ability to change work fronts with minimal impact if critical path issues are identified at structures or there are breakdowns = more flexibility
  • No weather dependence allowing installation in cold or wet conditions = reduced risk
  • Freestanding systems can be connected to form any emergency crossing points required in the barrier chain = full compatibility
  • Easily connected to adjacent steel barrier systems through DELTA BLOC transition units
  • Useable as a temporary barrier in traffic management before incorporation into permanent works = reduced costs and minimised disruption in maintenance
  • Should a vehicle impact result in a need for replacement of barrier, pre-cast sections can be replaced in one shift as opposed to multiple shifts needed for in-situ repair = reduced costs, quicker, safer, less disruption
  • Pre-cast units can be easily lifted out to create a temporary maintenance crossover
  • Public safety – Improving travelling public safety and minimising disruption through fewer movements into and out of site
  • Site safety – 50% reduction in barrier installation personnel exposed to traffic risk
  • Better quality – Certainty of quality for materials, finishes and fit prefabricated in factory controlled conditions = right first time
  • Sustainability: No flushing / cleaning or waste concrete = reduced site waste

Precast concrete vehicle restraint systems can provide measurable benefits to all stakeholders and DELTA BLOC UK hope that their recent successes will provide further evidence to Highways England and their delivery partners that precast solutions can be advantageous when delivering Strategic Road Network projects.

Highways InProfile

latest magazine issue
Highways jobs

Highways Capital Lead

£47,754 - £50,788
To be responsible for management of the Regional Highway Capital Delivery Teams South Wales
Recruiter: South Wales Trunk Road Agent

Senior Development Management Engineer

£37,938 - £44,711
In line with our One Coventry Values, we want to ensure that our communities are represented across our workforce Coventry, West Midlands
Recruiter: Coventry City Council

Head of Highways

£66,366 - £85,284 pa
Highway Operations is a large division within the Planning, Growth & Infrastructure. Enfield (City/Town), London (Greater)
Recruiter: Enfield London Borough Council

Circular Economy Officer - FTC till the 31st March 26

£26526.00 - £31208.00 per annum + + 26 Days Leave & Local Gov Pension
... England, Essex, Chelmsford
Recruiter: Essex County Council

Director Highways, Transport & Waste Management

up to £120k
There for Nottinghamshire. There for each other. There for you. Nottinghamshire
Recruiter: Nottinghamshire County Council

Director of Highways and Transportation

£126,909
We’re seeking a dynamic and innovative leader to spearhead our Highways and Transportation services. Essex
Recruiter: Essex County Council

Senior Structures Technician

£32,654 - £36,124 plus circa £2000 - £4000 OT (variable
To lead on the planning, delivery and reporting of the highway structures General Inspection programme. Baglan, Port Talbot
Recruiter: South Wales Trunk Road Agent

Assistant Director of Place Operations

£85,962 to £93,267
Bury is a proud and prosperous borough Bury, Greater Manchester
Recruiter: Bury Council

Career Grade Transport Planner (Carer Grade 6-8)

Grade 06 (£29,093 - £32,654) TO Grade 08 (£37,938 - £41,511)
This is a fantastic opportunity to work for a forward thinking and dynamic transport authority located in the heart of the North West Warrington, Cheshire
Recruiter: Warrington Borough Council

Principal Performance and Assurance Manager

£Competitive
We have an exciting opportunity for a highly motivated Principal Performance and Assurance Manager to join our Senior Management Team SBIM Avonmouth, Bristol
Recruiter: Amey

Principal Construction Manager

£Competitive
We are excited to offer a fantastic opportunity for a Permanent Principal Construction Manager to join our dynamic Area 12 West Yorkshire
Recruiter: Amey

Electrician

£Competitive
We are excited to offer a fantastic opportunity for two Permanent Electricians Tingley, Wakefield
Recruiter: Amey

Asset Development Manager

£44,111 per annum (pay award pending)
Do you want to work for an organisation that values you as an individual? West Yorkshire
Recruiter: West Yorkshire Combined Authority

Principal Engineer – Structures Capital Delivery

£43,693 - £47,754
To act as one of the Agent's technical experts for highway structures schemes and related issues South Wales
Recruiter: South Wales Trunk Road Agent

Senior Engineer Programme Management

£36,124 - £39,513
To support the Principal Engineer ensuring effective co-ordination, programming and contract administration. South Wales
Recruiter: South Wales Trunk Road Agent

Senior Engineer – Structures Delivery

£36,124 - £39,513
To support the Principal Engineer Structures (Capital Works) and deputise if necessary South Wales
Recruiter: South Wales Trunk Road Agent

Senior Engineer – Structures Condition

£36,124 - £39,513 plus circa £2500 - £4000 OT (variable)
To take the lead role on the Structures Principal and General Inspection programmes South Wales
Recruiter: South Wales Trunk Road Agent

Senior Engineer (Consultancy)

£43,693 - £50,788 
In line with our One Coventry Values, we want to ensure that our communities are represented across our workforce Coventry, West Midlands
Recruiter: Coventry City Council

Carbon and Net Zero Manager

£47,754 - £50,788
To lead and manage the carbon strategy for the Agent by developing a programme South Wales
Recruiter: South Wales Trunk Road Agent

Highways Engagement Officer - WMF1977e

£33,366 - £34,314
The role will provide specialist support within the Highways service Kendal, Cumbria
Recruiter: Westmorland and Furness Council
SUBSCRIBE NOW

Latest Video

Subscribe to Highways today to ensure you keep your finger on the pulse of everything happening in the UK road network throughout the year.

SUBSCRIBE NOW